Now is time for some panicky wait time. I’m really hoping I did not forget anything critical. If everything goes to plan we’ll be 4 to man the gigantic pump I requested and reel the cement mix in place. I have some shovels, rakes and I rented a vibrating ruler to help the finish.

weather is back to seasonal normals at around 25 after too many weeks over 30+.

Still I’m pretty sure I’m forgetting something.

  • unitedwithme@lemmy.today
    link
    fedilink
    arrow-up
    8
    ·
    21 days ago

    Make sure to add those pizza topper looking things to keep the metal held up in place when the concrete is poured.

    • a4ng3l@lemmy.worldOP
      link
      fedilink
      arrow-up
      3
      ·
      21 days ago

      Like the outrageously priced cement cast thingy I added everywhere under the mesh? It’s like cement snake thingies 2 inches high, 4 feet long. I laid down like 60.

      • sik0fewl@piefed.ca
        link
        fedilink
        English
        arrow-up
        1
        ·
        20 days ago

        What are those snake things? Are they just to hold up the rebar? They must do something else?

        • a4ng3l@lemmy.worldOP
          link
          fedilink
          arrow-up
          2
          ·
          20 days ago

          Yup. I saw some talented dudes doing without but I’m absolutely not confident to pull that so snake things it is.

            • a4ng3l@lemmy.worldOP
              link
              fedilink
              arrow-up
              6
              ·
              21 days ago

              They just make sure the metal meshing stays in the middle of the slab and doesn’t go straight to the bottom. Also they go sssSsSSSsssss.

              • grue@lemmy.world
                link
                fedilink
                arrow-up
                3
                ·
                21 days ago

                The mesh should be about 1/3 of the way up from the bottom, not in the middle. The point of the reinforcement is to resist tensile stress, and the stress in the middle is 0.

                Tensile stress increases linearly to the bottom of the slab, but you can’t put the metal all the way at the bottom because you need enough concrete under it to embed it properly.

                (I realize you probably didn’t mean “middle” literally, but just in case…)

                • a4ng3l@lemmy.worldOP
                  link
                  fedilink
                  arrow-up
                  3
                  ·
                  20 days ago

                  That’s actually a welcomed confirmation :) They are 4cm up the bottom and the slab is 12cm itself. So we are tight at a 3rd 🎉

  • Ghostalmedia@lemmy.world
    link
    fedilink
    English
    arrow-up
    6
    ·
    21 days ago

    Don’t forget to hide something cool in pour for someone to find in the future.

    Get a little Han Solo action figure from Amazon or something.

  • vrek@programming.dev
    link
    fedilink
    English
    arrow-up
    4
    ·
    21 days ago

    Be nice and buy a case of water or if you want to be fancy Gatorade/poweraid for the workers. It won’t help the concrete directly but being nice to workers typically means they will go the extra bit to make it actually nice instead of the minimum.

    • a4ng3l@lemmy.worldOP
      link
      fedilink
      arrow-up
      3
      ·
      21 days ago

      It won’t help the concrete directly but being nice to workers typically means they will go the extra bit to make it actually nice instead of the minimum.

      Ho for sure I’ll have water, various drinks, beers and french frises for everyone when it’s over :)

      • vrek@programming.dev
        link
        fedilink
        English
        arrow-up
        3
        arrow-down
        1
        ·
        21 days ago

        Offer water as they work too, beer hold off till they finish but water should always be available