    It actually makes more sense to build them in Alberta than most of the US to be honest. If these things are going to be run off fossil fuels anyway, it is more efficient to build them local to the fuel rather than building pipelines to ship it elsewhere then burning it there to run those data centers.

    The article says itself that the data center is planned to be closed loop water (so effectively no water use) but then assumes that the natural gas power plant WILL be consuming water, when those too can be built with closed loop water systems.

    Personally I’d like to see all datacenters require 100% renewable power going forward, but that’s not realistically happening.

      • BlameThePeacock@lemmy.ca
        link
        fedilink
        English
        arrow-up
        1
        arrow-down
        2
        ·
        4 天前

        You really will throw every single possible infraction against AI, no mattery how tiny. You’re now blaming AI for a contractor disposing of wastewater during construction that ended up having some higher levels of a bacteria in it? How is that in any way the fault of AI? The construction of datacenters isn’t somehow different such that it’s more likely to generate bacteria wastewater. This is possible in any construction project.

        • Tm12@lemmy.ca
          link
          fedilink
          English
          arrow-up
          2
          ·
          4 天前

          It’s a closed-water data centre owned by Meta which is exactly what has been approved in Alberta.

          • BlameThePeacock@lemmy.ca
            link
            fedilink
            English
            arrow-up
            1
            arrow-down
            2
            ·
            edit-2
            4 天前

            And what does that have to do with construction water treatment by a specific contractor?

            I too can dump contaminated water just doing renovations on my home by leaving it out or not following proper procedures for disposing of it.

            There isn’t a special AI related cause to it. It’s a relatively rare bacteria that primarily impacts immunosuppressed patients when it shows up (which is rare) and there’s only four known fatalities, and they mostly picked it up in hospitals while being treated for other things.

            https://www.sciencedirect.com/science/article/pii/S1201971226000780 https://pmc.ncbi.nlm.nih.gov/articles/PMC5684090/

            The contamination from the construction happened while they were doing flush and fill on the pipes at the facility, just like what would happen with any new building that contains plumbing. It can easily be cleaned with standard options like bleach if it’s known to be an issue.

    • voluble@lemmy.ca
      link
      fedilink
      arrow-up
      4
      ·
      5 天前

      Thousand acre ai compute facilities offer significant drawbacks and no tangible benefits to Alberta.

      Personally I’d like to see all datacenters require 100% renewable power going forward, but that’s not realistically happening.

      Do not expect that to ever happen. Meta’s facility will use 1GW of power. Right now as I write this, Alberta is generating a total of 10GW. There are something like 25GW of proposed data centre projects in the queue for the province. Renewables cannot and will not be used for facilities that use this much power. It’s impossible.

      • BlameThePeacock@lemmy.ca
        link
        fedilink
        English
        arrow-up
        1
        arrow-down
        2
        ·
        4 天前

        Where the fuck did you get your numbers? Alberta has almost 25 GW of installed capacity right now, and peak demand of something in the neighborhood of 13-14 GW

        In 2024, they installed about 1.4GW of Solar and Wind alone.

        https://ippsa.com/industry

          • BlameThePeacock@lemmy.ca
            link
            fedilink
            English
            arrow-up
            1
            ·
            2 天前

            How does that invalidate the fact that there is 10-12 GW of spare capacity above peak demand already built?

            Or that there was 1.4GW of capacity installed in 2024 that could be used to power this kind of data center?

            How are your arguments in any way actual arguments against building this?

            • voluble@lemmy.ca
              link
              fedilink
              arrow-up
              1
              ·
              2 天前

              You’re aware that the wind isn’t always blowing, and the sun isn’t always shining, right?

              It’s critical to understand the difference between MC and TNG. You should learn about them before going off on people. It’s clear you don’t understand how the energy grid works.

              • BlameThePeacock@lemmy.ca
                link
                fedilink
                English
                arrow-up
                1
                ·
                2 天前

                I can throw acronyms around too.

                LCOS for batteries at this point is low enough to make even “the sun isn’t shining and the wind isn’t blowing” renewables viable.

                If renewables are so poor a choice for power, why are they being built in such massive quantities even in places that hate renewables?

                Maybe if you understood how the world worked better, you wouldn’t get so focused on arguing about what used to be possible and instead focus on what is possible now.

                Instead, you’re arguing to not build datacenters in Alberta and instead have them in the US because… renewables aren’t always available?

                • voluble@lemmy.ca
                  link
                  fedilink
                  arrow-up
                  1
                  ·
                  2 小时前

                  You’re in this thread hoping that paradigm shifts in battery tech, AB building refineries, and using what you incorrectly assumed is 10GW of unused headroom in the power grid, all for ai compute facilities.

                  I’m not sure why you’re gunning so hard for ai compute facilities to be built in Alberta specifically, and your unsophisticated understanding of the way energy works makes it hard to take your position seriously.

        • non_burglar@lemmy.world
          link
          fedilink
          arrow-up
          2
          ·
          4 天前

          Idk if you’ve ever play Factorio, but it’s the same premise:

          Complexity: Essentially, there isn’t enough demand to justify the expense and massive investment of money and resources. With petroleum refinement, you get byproducts and you need to either store them or make products from them, so it’s not just a plant or two, it’s a whole set of them.

          Cost: Alberta is rich in extracted, stable crude oil and bitumen, but refineries are expensive. Like, really, really expensive. It doesn’t make economic sense to heavily subsidize its processing locally, when it’s so much cheaper to send it to the USA and elsewhere.

    • Auli@lemmy.ca
      link
      fedilink
      English
      arrow-up
      3
      ·
      4 天前

      What’s the point. Its still an american company building it won’t create any long term jobs. And America laws still apply to all data in it.

      • BlameThePeacock@lemmy.ca
        link
        fedilink
        English
        arrow-up
        1
        arrow-down
        1
        ·
        4 天前

        It will create some long term jobs, while it’s not like an office with hundreds of people inside of every day it it still requires significant physical upkeep and management.

        It’s not like there’s a lack of space in the area and this will take away from higher density offices.

    • SaveTheTuaHawk@lemmy.ca
      link
      fedilink
      English
      arrow-up
      2
      ·
      4 天前

      it is more efficient to build them local to the fuel rather than building pipelines to ship it elsewhere then burning it there to run those data centers.

      Alberta does not make fuel, they make a tar sludge that needs to be refined in the US to make fuel. 100 years of tar sands and they still haven’t invested in a decent local refinery.

      • BlameThePeacock@lemmy.ca
        link
        fedilink
        English
        arrow-up
        1
        ·
        2 天前

        None of that is relevant. Datacenters use electricity, which comes from Natural Gas Power Plants, which use Natural Gas, not Oil from the Oilsands. Natural gas is also exported via pipelines to the rest of Canada and the US.