• Denjin@feddit.uk
    link
    fedilink
    English
    arrow-up
    6
    ·
    5 days ago

    There’s a fair bit of work that goes into hooking up a block of flats, including lots of cables throughout the building, drilling through walls, installing equipment in the basement, risers, each floor and each flat at the end. Freeholders need to sign it all off so don’t know what a law change will entail.