• Zagorath@aussie.zoneOP
    link
    fedilink
    English
    arrow-up
    11
    ·
    9 months ago

    14 billion to induce more demand on a corridor that already has eight lanes of road.

    Yet they can’t get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.